MODIS IOT Terra Weekly Report
Mission Operations Days: 2000/267 to 2000/273
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Terra (AM-1) is in Normal Ops Mode MODIS is in Science Mode - A Side |
||
| Component | State(s) | Comment |
|---|---|---|
| Blackbody | A On (290 K); B Off | Nominal |
| Calibration Electronics | A On; B Off | Nominal |
| Control Processor | A On; B Off | Nominal |
| Nadir Door | Unlatched, Open | Nominal |
| Space View Door | Unlatched, Open | Nominal |
| Solar Diffuser Door | Unlatched, Closed | Nominal |
| FDDI Formatter | A On; B Off | Nominal |
| FDDI Port | A On; B Off | Nominal |
| FIFO Memory | #1 & #2 On; #3 & #4 Off | Nominal |
| Format Processor | A On; B Off | Nominal |
| Power Supplies | #1 On, #2 Off | Nominal |
| PV VIS FPA | A On; B Off | Nominal |
| PV NIR FPA | A On; B Off | Nominal |
| PV SMIR FPA | A On; B Off | Nominal |
| PV LWIR FPA | A On; B Off | Nominal |
| PC LWIR FPA | A On; B Off | Nominal |
| RC Outgas Heaters | All Off (CS, IS, OS) | Nominal |
| RC LWIR FPA Heater | On (83 K) | Nominal |
| RC SMIR FPA Heater | Off | Nominal |
| Scan Assembly | A On; B Off | Nominal |
| SDSM | A Off; B Off | Nominal |
| SRCA | A Off; B Off | Nominal |
| PS1 Survival Heater | Enabled | Nominal |
| PS2 Survival Heater | Enabled | Nominal |
| Timing Generator | A On; B Off | Nominal |
| Flight Software | Rev BD + 3 sets of patches
| Nominal |
| Inhibit Ids Set | None | Nominal |
| TMONs Enabled | 66, 67, 68 | Nominal |
None
Sunday, September 24, 2000None
Monday, September 25, 2000None
Tuesday, September 16, 2000None
Wednesday, September 27, 2000None
Thursday, September 28, 2000None
None
2000/273 20:19:27 ATC Load OA-15: SD/SDSM Open
2000/273 21:58:20 ATC Load OA-16: SD/SDSM Screened
None
Sunday, October 1, 2000None
Monday, October 2, 2000None
Tuesday, October 3, 2000None
Wednesday, October 4, 2000
2000/278 07:27:08 ATC Load OA-15: SD/SDSM Open
2000/278 09:06:01 ATC Load OA-16: SD/SDSM Screened
None
Friday, October 6, 2000None
The next Drag Makeup Maneuver is planned for October 4th.
The next MODIS Lunar Roll Maneuver is planned for October 17th.
Continued monitoring for formatter errors and loss of cooler margin.
Five formatter errors have been caught by the flight software patch recently, their event times are:
2000/256 14:12:42
2000/271 12:33:09
2000/272 07:06:51
2000/273 04:32:03
2000/273 06:00:15
The address of each of these errors have been seen previously. The MODIS IOT is currently trending telemetry, orbital position, and other internal/external spacecraft events in an attempt to find the cause of these occasional formatter errors.
MODIS is in Science Mode on the A-side with the SVD and NAD open, operating with the Formatter Resolution Flight Software Patches.
The Radiative Cooler intermediate stage temperature has slowly been increasing since approximately day 240. During this time the LWIR focal plane heater margin has been decreasing. The IOT is continuing to trend these telemetry mnemonics.
None
SRCA 10W Lamp #1: 173.5 of 500 hours
SRCA 10W Lamp #2: 135.9 of 500 hours
SRCA 10W Lamp #3: 145.1 of 500 hours
SRCA 10W Lamp #4: 61.5 of 500 hours
SRCA 1W Lamp #1: 556.1 of 4000 hours
SRCA 1W Lamp #2: 276.3 of 4000 hours
Solar Diffuser Door: 1417 of 3022 Movements
Nadir Aperture Door: 532 of 1316 Movements
Space View Door: 437 of 1316 Movements
Email the MODIS IOT
to report any problem with the MODIS IOT Web Pages.
Email the MCST Webmaster
to report any problem with the MCST Web Pages.
Email the MCST Helpdesk
to ask a question about Level 1B usage, algorithms or software.
Last Update: Tuesday, 14-Jan-2003 16:04:44 EST