MAIN PAGEMODIS INFOINSTRUMENT OPSWeekly ReportsMODIS HistoryCALIBRATIONL1B PRODUCT INFO
|
MODIS IOT Terra Weekly Report
Mission Operations Days: 2001/146 to 2001/152
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Terra (AM-1) is in Normal Ops Mode with SSR supersets 30 and 31 unallocated MODIS is in Science Mode - B Side |
||
| Component | State(s) | Comment |
|---|---|---|
| Blackbody | A Off; B On (290 K) | Nominal |
| Calibration Electronics | A Off; B On | Nominal |
| Control Processor | A Off; B On | Nominal |
| Nadir Door | Unlatched, Open | Nominal |
| Space View Door | Unlatched, Open | Nominal |
| Solar Diffuser Door | Unlatched, Closed | Nominal |
| FDDI Formatter | A Off; B On | Nominal |
| FDDI Port | A On; B Off | Nominal |
| FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal |
| Format Processor | A Off; B On | Nominal |
| Power Supplies | #1 Off; #2 On | Nominal |
| PV VIS FPA | A Off; B On | Nominal |
| PV NIR FPA | A Off; B On | Nominal |
| PV SMIR FPA | A Off; B On | Nominal |
| PV LWIR FPA | A Off; B On | Nominal |
| PC LWIR FPA | A Off; B On | Nominal |
| RC Outgas Heaters | All Off (CS, IS, OS) | Nominal |
| RC LWIR FPA Heater | On (83 K) | Nominal |
| RC SMIR FPA Heater | Off | Nominal |
| Scan Assembly | A Off; B On | Nominal |
| SDSM | A Off; B Off | Nominal |
| SRCA | A Off; B Off | Nominal |
| PS1 Survival Heater | Enabled | Nominal |
| PS2 Survival Heater | Enabled | Nominal |
| Timing Generator | A Off; B On | Nominal |
| Flight Software | Rev BD + 2 set of patches
| Nominal |
| Inhibit Ids Set | None | Nominal |
| TMONs Enabled | 68 | Nominal |
None
Saturday, May 26, 2001None
Sunday, May 27, 2001None
Monday, May 28, 2001None
Tuesday, May 29, 2001None
Wednesday, May 30, 2001
2001/150 20:38:23 ATC OA-16: SD/SDSM Screened
2001/150 22:17:15 ATC OA-15: SD/SDSM Open
None
Friday, June 01, 2001
2001/152 15:07:59 – 15:14:19 Real-Time LWIR Vdet Sweep, Itwk =79, Vdet = 160-224 with
8 steps of 8 counts for 30 seconds each
2001/152 15:15:36 Real-Time Set LWIR Itwk/Vdet to 79/185
2001/152 15:49:48 Real-Time Turn off LWIR FPA heater
2001/152 15:50:53 Real-Time Turn on SMIR FPA heater
2001/152 17:50:53 Real-Time Turn off SMIR FPA heater
2001/152 17:51:49 Real-Time Turn on LWIR FPA heater
None
None
Sunday, June 3, 2001None
Monday, June 4, 2001None
Tuesday, June 5, 2001None
Wednesday, June 6, 2001None
Thursday, June 7, 2001None
Friday, June 8, 2001None
Based on the current operations plan, calibration activities for June will include an SRCA Full Radiometric, PV Ecal, PC Ecal, and weekly SD/SDSM calibrations.
The next MODIS Lunar Roll Maneuver is scheduled for June 10, 2001. The roll angle is - 20.0293 degrees with a data collection from 2001/161-23:07:25 to 2001/161-23:13:55.
None
MODIS is in Science Mode on the B-side with the SVD and NAD open, operating with the Formatter Resolution Flight Software Patches (FRFSP).
Telemetry is trending nominally. The amount of power required by the focal plane heater to maintain 83.0K is still slowly decreasing, although the spacecraft is currently near the minimum absolute solar beta angle for the year.
MOPITT Anomaly:
The MOPITT team is still working to recover their instrument to science operations.
SRCA 10W Lamp #1: 186.0 of 500 hours
SRCA 10W Lamp #2: 142.9 of 500 hours
SRCA 10W Lamp #3: 152.1 of 500 hours
SRCA 10W Lamp #4: 61.5 of 500 hours
SRCA 1W Lamp #1: 557.5 of 4000 hours
SRCA 1W Lamp #2: 276.3 of 4000 hours
Solar Diffuser Door: 1621 of 3022 Movements
Nadir Aperture Door: 532 of 1316 Movements
Space View Door: 437 of 1316 Movements
Email the MODIS IOT
to report any problem with the MODIS IOT Web Pages.
Email the MCST Webmaster
to report any problem with the MCST Web Pages.
Email the MCST Helpdesk
to ask a question about Level 1B usage, algorithms or software.
Last Update: Tuesday, 25-Feb-2003 18:34:07 EST