MAIN PAGEMODIS INFOINSTRUMENT OPSWeekly ReportsMODIS HistoryCALIBRATIONL1B PRODUCT INFO
|
MODIS IOT Terra Weekly Report
Mission Operations Days: 2001/230 to 2001/236
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Terra (AM-1) is in Normal Ops Mode MODIS is in Science Mode - A Side |
||
| Component | State(s) | Comment |
|---|---|---|
| Blackbody | A On (290 K); B Off | Nominal |
| Calibration Electronics | A On; B Off | Nominal |
| Control Processor | A On; B Off | Nominal |
| Nadir Door | Unlatched, Open | Nominal |
| Space View Door | Unlatched, Open | Nominal |
| Solar Diffuser Door | Unlatched, Closed | Nominal |
| FDDI Formatter | A On; B Off | Nominal |
| FDDI Port | A On; B Off | Nominal |
| FIFO Memory | #1 & #2 On; #3 & #4 Off | Nominal |
| Format Processor | A On; B Off | Nominal |
| Power Supplies | #1 On; #2 Off | Nominal |
| PV VIS FPA | A On; B Off | Nominal |
| PV NIR FPA | A On; B Off | Nominal |
| PV SMIR FPA | A On; B Off | Nominal |
| PV LWIR FPA | A On; B Off | Nominal |
| PC LWIR FPA | A On; B Off | Nominal |
| RC Outgas Heaters | All Off (CS, IS, OS) | Nominal |
| RC LWIR FPA Heater | On (83 K) | Nominal |
| RC SMIR FPA Heater | Off | Nominal |
| Scan Assembly | A On; B Off | Nominal |
| SDSM | A Off; B Off | Nominal |
| SRCA | A Off; B Off | Nominal |
| PS1 Survival Heater | Enabled | Nominal |
| PS2 Survival Heater | Enabled | Nominal |
| Timing Generator | A Off; B On | Nominal |
| Flight Software | Rev BD + 2 set of patches
| Nominal |
| Inhibit Ids Set | None | Nominal |
| TMON 66 (SRCA A) | Disabled | Nominal |
| TMON 67 (SRCA B) | Disabled | Nominal |
| TMON 68 (FIFO) | Enabled | Nominal |
| TMON 69 (EPS Current) | Disabled | Nominal |
None
Sunday, August 19, 2001None
Monday, August 20, 2001None
Tuesday, August 21, 2001None
Wednesday, August 22, 2001
2001/234 20:14:28 ATC OA-16: SD/SDSM Screened
2001/234 21:53:21 ATC OA-15: SD/SDSM Open
None
Friday, August 24, 2001None
None
None
Saturday, August 25, 2001None
Sunday, August 26, 2001None
Monday, August 27, 2001None
Tuesday, August 28, 2001None
Wednesday, August 29, 2001
241/20:21:04 ATC OA-16: SD/SDSM Screened
241/21:59:57 ATC OA-15: SD/SDSM Open
Anticipated day to perform memory load to clear FR error/count buffers
Friday, August 312, 2001None
The next Lunar Calibration roll maneuver is scheduled for day 2001/250 (September 7, 2001) with data collection from 20:03:47 to 20:10:17. The roll angle will be -7.5106 degrees.
The rate of formatter “error events” has increased during the past week, but there has been no impact to normal operations. (As a sneak-peak, the rate increased to ~20 per day over the weekend of August 24th - 27th)
MODIS is in Science Mode on the A-side with the SVD and NAD open, operating with the Formatter Resolution Flight Software Patches (FRFSP).
Note: SD/SDSM calibrations were planned to be reduced to once per two weeks. This plan has been revised; SD/SDSM calibrations will continue to be scheduled once each week until the end of November.
Trending has resumed with the instrument on the A-side. All appears nominal at this time.
None.
SRCA 10W Lamp #1: 189.1 of 500 hours
SRCA 10W Lamp #2: 144.8 of 500 hours
SRCA 10W Lamp #3: 154.0 of 500 hours
SRCA 10W Lamp #4: 61.5 of 500 hours
SRCA 1W Lamp #1: 558.0 of 4000 hours
SRCA 1W Lamp #2: 276.3 of 4000 hours
Solar Diffuser Door: 1685 of 3022 Movements
Nadir Aperture Door: 532 of 1316 Movements
Space View Door: 437 of 1316 Movements
Email the MODIS IOT
to report any problem with the MODIS IOT Web Pages.
Email the MCST Webmaster
to report any problem with the MCST Web Pages.
Email the MCST Helpdesk
to ask a question about Level 1B usage, algorithms or software.
Last Update: Wednesday, 26-Feb-2003 14:05:29 EST