Mission Operations Days: 2003/046 through 2003/052
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
AM-1 "Terra" is in Normal Mode PFM MODIS is in A-Side Nominal Science Mode (Cross Strapped with FR B) |
||
| Component | State(s) | Comment |
|---|---|---|
| Blackbody | A On; B Off | Nominal Science Mode |
| Calibration Electronics | A On; B Off | Nominal Science Mode |
| Control Processor | A On; B Off | Nominal Science Mode |
| Nadir Door | Unlatched, Open | Nominal Science Mode |
| Space View Door | Unlatched, Open | Nominal Science Mode |
| Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
| FDDI Formatter | A On; B Off | Nominal Science Mode |
| FDDI Port | A On; B Off | Nominal Science Mode |
| FIFO Memory | #1 & #2 On; #3 & #4 Off | Nominal Science Mode |
| Format Processor | A Off; B On | Nominal Science Mode |
| Power Supplies | #1 On, #2 Off | Nominal Science Mode |
| PV VIS FPA | A On; B Off | Nominal Science Mode |
| PV NIR FPA | A On; B Off | Nominal Science Mode |
| PV SMIR FPA | A On; B Off | Nominal Science Mode |
| PV LWIR FPA | A On; B Off | Nominal Science Mode |
| PC LWIR FPA | A On; B Off | Nominal Science Mode |
| RC Outgas Heaters | All Off | Nominal Science Mode |
| RC LWIR FPA Heater | On (83K) | Nominal Science Mode |
| RC SMIR FPA Heater | Off | Nominal Science Mode |
| Scan Assembly | A On; B Off | Nominal Science Mode |
| SDSM | Off | Nominal Science Mode |
| SRCA | Off | Nominal Science Mode |
| PS1 Survival Heater | Enabled | Nominal Science Mode |
| PS2 Survival Heater | Enabled | Nominal Science Mode |
| Timing Generator | A On; B Off | Nominal Science Mode |
| Flight Software | Rev BD + 9 sets of patches
| Nominal Science Mode |
| Inhibit Ids Set | none | Nominal Science Mode |
| TMON 66 | Disabled | Nominal Science Mode |
| TMON 67 | Disabled | Nominal Science Mode |
| TMON 68 | Enabled | Nominal Science Mode |
| TMON 69 | Disabled | Nominal Science Mode |
None
Sunday, February 16, 2003None
Monday, February 17, 2003None
Tuesday, February 18, 2003None
Wednesday, February 19, 2003None
Thursday, February 20, 2003None
Friday, February 21, 2003
2003/052 01:00:59 – 01:01:07 Real-time MOD_FR_MODE(‘DAY’)
Sets formatter rate to DAY for lunar calibration
2003/052 01:01:24 – 01:02:05 Real-time MOD_SCI_ABNORM(‘ABNORM’)
Sets science abnormal flag for upcoming sector rotation and DR turn off
2003/052 01:02:20 – 01:03:07 Real-time MOD_DC_RESTORE(‘OFF’,’OFF’)
Turns off PV and PC DC Restore
2003/052 01:03:18 – 01:03:56 Real-time MOD_FR_DELTA(-3072)
Sets sector rotation to –3072 for earth view sector rotated to the space view port
2003/052 01:08:53 – 01:09:23 Real-time MOD_FR_MODE(‘DAY’)
Sets formatter rate to DAY for lunar calibration
This was set a second time because a command in the ATC load set the
formatter to night rate at 01:03:07.
2003/052 01:14:56 – 01:15:34 Real-time MOD_FR_DELTA(0)
Sets sector rotation nominal value of zero
2003/052 01:15:45 – 01:16:30 Real-time MOD_DC_RESTORE(‘ON’,’ON’)
Turns on PV and PC DC Restore
2003/052 01:16:40 – 01:17:17 Real-time MOD_SCI_ABNORM(‘NORM’)
Clears the science abnormal flag
2003/052 01:17:27 – 01:18:04 Real-time MOD_FR_MODE(‘NIGHT’)
Sets formatter to NIGHT rate at the conclusion of the lunar calibration
The MODIS lunar calibration activities are typically scheduled using ATC stored commands. Due to inclement weather at Goddard, the MODIS stored command activities did not make it into the schedule. The lunar calibration was completed using real-time commanding instead.
2003/056 13:46:00 - 13:48:31 ATC MOD_OA27_PV_ECAL.3
At approximately 15:00 - 16:00 GMT, the Solar Diffuser door will be opened to the screened position, the SDSM will be powered on the A-side, and the SDSM mirror will be stepped to the Sun position. This will begin a 2-day continuous SD calibration.
Thursday, February 27, 2003
2003/058 17:32:44 - 17:45:55 ATC MOD_OA16_SD_SCREEN_FXD_SUN_A.1
2003/058 19:11:37 - 19:24:48 ATC MOD_OA15_SD_OPEN_FIXED_SD_A.1
The next Terra Drag Make-up Maneuver is being planned for March 6th, 2003 at approximately 19:17 GMT.
The Terra Deep Space Calibration Maneuvers are now being planned for March 26th, 2003 (without the moon in the instruments fields of view) and April 14th, 2003 (with the moon in the spacecraft orbit plane). Details of these maneuvers will be provided closer to the event dates.
None.
MODIS is in Science Mode, using all A-side components, but cross-strapped to Formatter B, with the blackbody maintained at 290K.
Nominal telemetry tracking is taking place. The intermediate stage radiative cooler temperature that had been increasing has now leveled off. The cooler temperatures and focal plane heater power will continue to be monitored with the expected solar beta angle changes.
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links web pages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
SRCA 10W Lamp #1: 208.4 of 500 hours
SRCA 10W Lamp #2: 157.2 of 500 hours
SRCA 10W Lamp #3: 166.4 of 500 hours
SRCA 10W Lamp #4: 61.9 of 500 hours
SRCA 1W Lamp #1: 561.2 of 4000 hours
SRCA 1W Lamp #2: 276.5 of 4000 hours
Solar Diffuser Door: 2109 of 3022 Movements
Nadir Aperture Door: 536 of 1316 Movements
Space View Door: 439 of 1316 Movements
Email the MODIS IOT
to report any problem with the MODIS IOT Web Pages.
Email the MCST Webmaster
to report any problem with the MCST Web Pages.
Email the MCST Helpdesk
to ask a question about Level 1B usage, algorithms or software.
Last Update: Thursday, 13-Mar-2003 11:18:10 EST